• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar
Schiller and Hersh Associates, Inc.

Schiller and Hersh Associates, Inc.

Consulting M/E/P Engineers

636 Skippack Pike, Suite 200
Blue Bell, PA 19422
P: 215.886.8947
F: 215.886.8956
  • Home
  • Firm
    • Mission
    • Staff
    • Client Testimonials
  • Services
  • Portfolio
    • Airports
    • Correctional Facilities
    • Energy Audits
    • Governmental
    • Green Building
    • Higher Education
    • Historic
    • Industrial
    • K – 12
    • LEED Certified Design
    • Religious
    • Senior Living
    • Solar Energy
    • Transportation
    • Water-Wastewater
  • Careers
  • News & Announcements
  • Contact
You are here: Home / Portfolio / LEED Certified Design / Makefield Elementary School

Makefield Elementary School

MAKEFIELD ELEMENTARY SCHOOL

School District: Pennsbury School District, Falls Township, PA

Project Name: Renovation of Makefield Elementary (K-5) School

Project Size: 65,000 Sq. Ft

Services Provided:

  • LEED Gold Certified Project.
  • Mechanical (HVAC, Plumbing and Fire Protection) and Electrical engineering for addition to and renovation of 65,000 SF historic school. 
  • Project electrical systems includes:  12 phases of construction to allow full occupancy and operation of the school, new 34.5kV PECO electrical service, lighting & lighting controls, cable tray for all structured cabling systems, fire alarm system, PA system, telephone systems, atomic-wireless based master clock systems, electrical support for new commercial Kitchen and Cafeteria addition and 25kW roof mounted PV system.  
  • The project included the replacement of the H&V system with a new HVAC system, new plumbing piping and fixtures and a fire protection system.  Project construction phasing was carefully designed to allow the continued use of the existing steam heating system while new hot water systems came on-line.  Eventual conversion to condensing-style high efficiency hot water boiler system with a remote-barrel chiller system serving 4-pipe distribution with vertical unit ventilators and roof-mounted energy recovery units.

February 27, 2011
Filed Under: Green Building, K - 12, LEED Certified Design, Solar Energy

Primary Sidebar

Our Services

  • Mechanical
  • Electrical
  • Plumbing
  • Fire Protection
  • Energy & Sustainability

Contact Us

  • This field is for validation purposes and should be left unchanged.

Copyright © 2025 ยท Schiller and Hersh Associates, Inc. All Rights Reserved.
Website Design and Development by GetPhound.

Schiller and Hersh Associates, Inc.
  • Home
  • Firm
    • Mission
    • Staff
    • Client Testimonials
  • Services
  • Portfolio
    • Airports
    • Correctional Facilities
    • Energy Audits
    • Governmental
    • Green Building
    • Higher Education
    • Historic
    • Industrial
    • K – 12
    • LEED Certified Design
    • Religious
    • Senior Living
    • Solar Energy
    • Transportation
    • Water-Wastewater
  • Careers
  • News & Announcements
  • Contact