• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar
Schiller and Hersh Associates, Inc.

Schiller and Hersh Associates, Inc.

Consulting M/E/P Engineers

636 Skippack Pike, Suite 200
Blue Bell, PA 19422
P: 215.886.8947
F: 215.886.8956
  • Home
  • Firm
    • Mission
    • Staff
    • Client Testimonials
  • Services
  • Portfolio
    • Airports
    • Correctional Facilities
    • Energy Audits
    • Governmental
    • Green Building
    • Higher Education
    • Historic
    • Industrial
    • K – 12
    • LEED Certified Design
    • Religious
    • Senior Living
    • Solar Energy
    • Transportation
    • Water-Wastewater
  • Careers
  • News & Announcements
  • Contact
You are here: Home / Portfolio / K - 12 / TREDYFFRIN-EASTTOWN SCHOOL DISTRICT

TREDYFFRIN-EASTTOWN SCHOOL DISTRICT

Conestoga High School Additions and Renovations

Scope of Work: Multi-phased project that consists of a 65,000 SF, 2-story addition and significant renovations in the existing Conestoga High School. The scope included:

  • Large, multi-story atrium space for small group work and large gatherings/instruction. 
  • 3 new Art rooms.
  • 7 new regular Classrooms
  • 4 new Special Education spaces.
  • 5 new Science labs.
  • 2 new Fabrication labs.
  • 2 new computer labs.
  • Renovations to Guidance, Student Services and Nurse suites.
  • Renovations and expansion of the weight room.
  • Renovations of 4 Science labs.
  • Renovations of spaces to create 11 regular classrooms. 
  • Renovations for Graphic Arts and Photo labs. 
  • Renovations of gang toilet rooms into single stall toilet facilities. 

MEPFP Scope Included:

  • New 15kV PECO service, including new 15kV distribution to 3 existing substations and 1 new substation. 
  • Relocation of underground hot and chilled water glycol piping systems from the site into a new tunnel beneath the new addition. 
  • New sprinkler service with a fire pump, backed up by a generator.
  • New 8,000 MBH boiler plant to parallel/backup the main boiler plant. 
  • New roof mounted AHUs, RTUs, DOAS systems and lab exhaust systems. 
  • Upgraded web-based HVAC DDC system. 
  • Re-building of the existing water cooled chiller system.
  • New domestic water booster pump system with 3 pumps and VFD system to serve the entire building.
  • New plumbing fixtures and piping systems, including automatic sensor controls.
  • High efficiency LED lighting systems with automatic lighting controls and dimming.
  • New 250kW natural gas generator serving half of the building. 
  • New emergency lighting systems throughout the entire building and new addition. 
  • New addressable fire alarm systems.
  • New AV systems for the atrium and all new classroom spaces.
  • Full low-voltage data, telephone, CATV, security camera design. 

July 1, 2024
Filed Under: K - 12

Primary Sidebar

Our Services

  • Mechanical
  • Electrical
  • Plumbing
  • Fire Protection
  • Energy & Sustainability

Contact Us

  • This field is for validation purposes and should be left unchanged.

Copyright © 2025 · Schiller and Hersh Associates, Inc. All Rights Reserved.
Website Design and Development by GetPhound.

Schiller and Hersh Associates, Inc.
  • Home
  • Firm
    • Mission
    • Staff
    • Client Testimonials
  • Services
  • Portfolio
    • Airports
    • Correctional Facilities
    • Energy Audits
    • Governmental
    • Green Building
    • Higher Education
    • Historic
    • Industrial
    • K – 12
    • LEED Certified Design
    • Religious
    • Senior Living
    • Solar Energy
    • Transportation
    • Water-Wastewater
  • Careers
  • News & Announcements
  • Contact