• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar
Schiller and Hersh Associates, Inc.

Schiller and Hersh Associates, Inc.

Consulting M/E/P Engineers

636 Skippack Pike, Suite 200
Blue Bell, PA 19422
P: 215.886.8947
F: 215.886.8956
  • Home
  • Firm
    • Mission
    • Staff
    • Client Testimonials
  • Services
  • Portfolio
    • Airports
    • Correctional Facilities
    • Energy Audits
    • Governmental
    • Green Building
    • Higher Education
    • Historic
    • Industrial
    • K – 12
    • LEED Certified Design
    • Religious
    • Senior Living
    • Solar Energy
    • Transportation
    • Water-Wastewater
  • Careers
  • News & Announcements
  • Contact
You are here: Home / Portfolio / K - 12 / Eleanor Roosevelt Elementary School Renovations

Eleanor Roosevelt Elementary School Renovations

Eleanor Roosevelt Elementary School Renovations

School District: Pennsbury School District, Falls Township, PA

Project Name: Renovation of the Eleanor Roosevelt Elementary School

Project Size: 83,000 sq. ft.

Services Provided:

Mechanical (HVAC, Plumbing and Fire Protection) and Electrical engineering for a 27,500 SF addition to and renovation of an existing 55,500 SF school.

The project achieved LEED Silver certification. 

Project Electrical systems: 

  • 9 phases of construction to allow full occupancy and operation of the school.
  • New 34.5kV PECO electrical service and a bio-degradable liquid filled transformer.
  • High efficiency lighting & lighting controls.
  • LED site lighting with controls integrated with the HVAC DDC system controls.  Designed to comply with LEED credit SSc8.
  • Cable trays for all structured cabling systems.
  • Communications systems:  Fire alarm system, PA system, telephone systems and atomic-wireless based master clock systems.
  • 50kW roof mounted solar photovoltaic system, representing a 7% reduction in yearly electrical usage, resulting in 4 LEED points for credit EAc2.
  • Temporary power design for server room that contains fiber optic communications for multiple District buildings and Schools.

Project Mechanical/Plumbing/Fire Protection systems:

  • Calculated 31% yearly utility savings compared to the current energy code in PA (ASHRAE 90.1-2007 base building), resulting in 11 LEED points for credit EAp2.
  • Replacement of the existing H&V system with a new HVAC system, including a high efficiency low-turndown 275 ton water cooled chiller with a high efficiency cooling tower.
  • Added sections and new burners to the existing Buderus boilers, including VFD’s on the hot water pumps.
  • New plumbing piping and fixtures, including low-flow with automatic sensors.
  • A new fire protection system. 
  • New HVAC DDC web-based control system based on CM3 Invensys.
  • Project construction phasing was carefully designed to allow the continued use of the existing hot water heating and domestic hot water systems during full building occupancy. 

December 11, 2012
Filed Under: Green Building, K - 12, LEED Certified Design, Solar Energy

Primary Sidebar

Our Services

  • Mechanical
  • Electrical
  • Plumbing
  • Fire Protection
  • Energy & Sustainability

Contact Us

  • This field is for validation purposes and should be left unchanged.

Copyright © 2025 · Schiller and Hersh Associates, Inc. All Rights Reserved.
Website Design and Development by GetPhound.

Schiller and Hersh Associates, Inc.
  • Home
  • Firm
    • Mission
    • Staff
    • Client Testimonials
  • Services
  • Portfolio
    • Airports
    • Correctional Facilities
    • Energy Audits
    • Governmental
    • Green Building
    • Higher Education
    • Historic
    • Industrial
    • K – 12
    • LEED Certified Design
    • Religious
    • Senior Living
    • Solar Energy
    • Transportation
    • Water-Wastewater
  • Careers
  • News & Announcements
  • Contact