• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar
Schiller and Hersh Associates, Inc.

Schiller and Hersh Associates, Inc.

Consulting M/E/P Engineers

636 Skippack Pike, Suite 200
Blue Bell, PA 19422
P: 215.886.8947
F: 215.886.8956
  • Home
  • Firm
    • Mission
    • Staff
    • Client Testimonials
  • Services
  • Portfolio
    • Airports
    • Correctional Facilities
    • Energy Audits
    • Governmental
    • Green Building
    • Higher Education
    • Historic
    • Industrial
    • K – 12
    • LEED Certified Design
    • Religious
    • Senior Living
    • Solar Energy
    • Transportation
    • Water-Wastewater
  • Careers
  • News & Announcements
  • Contact
You are here: Home / Portfolio / K - 12 / Christina Seix Academy ( Private School Campus)

Christina Seix Academy ( Private School Campus)

Ewing, West Trenton, NJ

Project Name: Geothermal Remediation, Phase 2 Residential and Phase 3 Athletic Construction

Scope of Work:  S&H was retained by CSA in 2013 to address HVAC system issues in the Phase 1 construction, which was designed by another engineering firm.  S&H worked over the period of 2 years to realize a stable, controllable and temperature-acceptable geothermal HVAC system for the phase 1 construction buildings on campus.  S&H was then hired under the Phase 2 and 3 construction contracts to design new buildings for the campus.

Phase 2 Residential Construction:

  • (2) New 31,000 SF, single-story residential cottage buildings. 
  • (1) New 13,500 SF, two-storage residential staff building.
  • (1) New 800 SF security building for a new secured rear entry to the campus. 
  • New variable refrigerant flow (VRF) HVAC systems with dedicated outside air systems (DOAS) for ventilation air along with a full HVAC DDC system.
  • New electrical systems including LED lighting, lighting controls, 15kV and 208V power systems from on campus, 150kW diesel generator, voice evaluation fire alarm systems, data & telephone IP cabling systems, A/V systems, security systems, IP security cameras, card access systems and fiber optic backbone cabling on campus back to the MDF in the Academic building. 
  • New plumbing systems.
  • New sprinkler systems. 

Phase 3 Athletic Construction:

  • (1) New 65,000 SF athletic, aquatic, tennis and recreation center. 
  • New heating and ventilation systems with ductsox for the tennis facility with (6) indoor courts and spectator viewing areas.
  • New pool dehumidification dedicated HVAC RTUs for the aquatic center. 
  • New traditional gas-fired, DX RTU equipment for the common spaces and locker rooms.
  • New electrical systems including LED lighting, lighting controls, 15kV and 208V power systems from on campus, 100kW diesel generator, voice evaluation fire alarm systems, data & telephone IP cabling systems, A/V systems, security systems, IP security cameras, card access systems and fiber optic backbone cabling on campus back to the MDF in the Academic building.
  • New plumbing systems.
  • New sprinkler systems. 

March 18, 2018
Filed Under: K - 12

Primary Sidebar

Our Services

  • Mechanical
  • Electrical
  • Plumbing
  • Fire Protection
  • Energy & Sustainability

Contact Us

  • This field is for validation purposes and should be left unchanged.

Copyright © 2025 ยท Schiller and Hersh Associates, Inc. All Rights Reserved.
Website Design and Development by GetPhound.

Schiller and Hersh Associates, Inc.
  • Home
  • Firm
    • Mission
    • Staff
    • Client Testimonials
  • Services
  • Portfolio
    • Airports
    • Correctional Facilities
    • Energy Audits
    • Governmental
    • Green Building
    • Higher Education
    • Historic
    • Industrial
    • K – 12
    • LEED Certified Design
    • Religious
    • Senior Living
    • Solar Energy
    • Transportation
    • Water-Wastewater
  • Careers
  • News & Announcements
  • Contact