Client: Rider University
Project Name: Indoor Practice Facility
Project Size: 12,000 sf
Scope of work:
S&H provided all mechanical, electrical, plumbing and fire protection services for a new athletic practice facility for Rider University’s Division 1 NCCA Basketball team.
Design included:
- Gas-fired DX HVAC system with ductsox duct distribution, dehumidification system and digital compressors with ECM variable speed condenser fans.
- 5kV service off campus system with new 225kVA transformer feed.
- Lighting compliant with NCAA Division 1 basketball program requirements; practice facility was to match the main game facility to allow for the same environment.
- Emergency lighting.
- Fire alarm system with tie-in to the central campus monitoring system
- Data, telephone and CATV IT Design
- Basketball practice video recording system design with a motorized HD camera, video streaming system for central-server archiving, 27” LED monitor and playback system all within a lockable, movable cart.
- Security systems, including card access.
- Cold and Hot water plumbing systems
- Sprinkler system
- New gas service to the building via the campus system.