JBS MOPAC 2

JBS / MOPAC Hide Plant

Written by Dale Kemmerer on . Posted in Industrial

JBS / MOPAC Hide Plant Project

Client: Swartley Brothers Engineers & JBS/MOPAC

Project: Electrical Power Distribution System Replacement

JBS MOPAC 2 JBS MOPAC 1

Scope of Work:

  • Design-Build project with Swartley Brothers Engineers.
  • Electrical load calculations.
  • 15kV cabling design.
  • Building addition to house the new electrical substation equipment and MCC’s.
  • Electrical substation design, including new 2500kVA & 3000kVA transformers and a double-ended 4000A switchboard and associated distribution.
  • New Motor Control Center design with feeder and branch circuit distribution.
  • Construction phasing and sequencing to allow the plant to operate on a 24×6 basis.
  • General electrical substation room layout, design and appurtenances.

Date of Service: 2013 to 2015