Clemens Food Group – Hatfield Packing

Written by Dale Kemmerer on . Posted in Industrial

Installation of (3) 700 HP Compressors

Client: Clemens Food Group, Hatfield Packing, PA

Project: Electrical Infrastructure for (3) New 700 HP Compressors

clemens1 clemens2

Scope of Work:

  • Motor starting study including power flow and voltage drop on the upstream buses through the 69kV substation. Analysis included determination of across-the-line vs. VFD starters for each compressor.
  • Electrical load calculations.
  • 15kV cabling design.
  • Electrical substation design, including new 2500kVA transformer, 3000A switchboard and associated distribution.
  • Feeders for (3) 700 HP compressors.
  • General electrical substation room layout, design and appurtenances such as heating, ventilation, lighting, fire alarm, etc.

Date of Service: 2012 to 2013